| | |
|
|
|
|
Raw materials Viewed: 580 times.
|
| Started cathedral folding the wicks Viewed: 518 times.
|
| Next two folds Viewed: 499 times.
|
|
| | |
| | |
|
|
|
|
Cathedral fold almost finished Viewed: 511 times.
|
| Ends tucked under Viewed: 534 times.
|
| A screw is then screwed through poi to make a hole for the cable assembly Viewed: 530 times.
|
|
| | |
| | |
|
|
|
|
Nut and cable assembly prepared Viewed: 519 times.
|
| Washer placed under bottom fold, nut and cable assembly run through poi, nut pushed through bottom of kevlar Viewed: 502 times.
|
| Assembling the top of the poi. Washer and quick link in place, swage sleeve ready to be crimped Viewed: 519 times.
|
|
| | |