Fortunately, all the really critical things left are not terribly time-consuming. Critical items are absolute requirements and must be done for the boat to be launched or sail. High priority items are things I'd like to finish before launch. Most medium items can be done at dockside. Low priority stuff can be put off unless it is easy.
Any help with these things would be appreciated. Obviously, I know I'm alone on cleaning the bilge, but if any of these things interests you, please let me know. Food and drink is always provided.
| Priority | Task | Notes |
|
|
||
| Critical | Replace engine water intake hose and strainer element | COMPLETED! |
| Critical | Install prop | COMPLETED! |
| Critical | Re-pack stuffing box | COMPLETED! |
| Critical | Chafed diesel return line | Ran new line. New hole cut and chafe guard installed. Just need to tie down the lines. |
| Critical | Check engine and transmission oil levels | Waiting until launch approaches |
| High | Clean engine air filter | COMPLETED! |
| High | Replace impeller on engine cooling pump | NOT NEEDED. Impeller checked; it's fine. |
| High | Fix engine control harness, senders, panel | COMPLETED! |
| High | De-grease engine and clean engine bilge | COMPLETED. |
| High | Install oil-absorber under engine | COMPLETED. |
| High | Change secondary fuel filter, bleed low pressure side | COMPLETED |
| Medium | Change primary fuel filter, drain and clean sedimenter | Cleaned and drained. But the replacement filter on board was the wrong size, so didn't change. |
| Medium | Check drainage holes from engine bilge to main bilge and route out if necessary | Checked; they look OK. |
|
|
||
| Critical | Paint bottom with VC17 | 99% done; just need to paint strut once repaired. |
| Critical | Install waste deck fill | COMPLETED! |
| Critical | Re-seal propeller strut | COMPLETED! |
| Critical | Epoxy and re-bed chainplates | Almost done. Need to re-bolt chainplates. |
| High | Install swim ladder | Almost completed! Need to install lanyard. |
| High | Fix leaking drain in anchor locker | COMPLETED! |
| High | Install replacement for broken cowl vent | COMPLETED! |
| High | Misc. gelcoat repair | |
| High | Inspect mast step, epoxy/gelcoat if necessary | |
| Medium | Replace plastic hatch track | Track has arrived. |
| Low | Fill in a few misc. holes on cockpit locker | |
| Low | Use adhesive to re-attach moonstone edging material in forward berth | |
|
|
||
| Critical | Splice new main halyard and pole lift | COMPLETED! |
| Critical | Splice jib halyard | Splice completed, cover needs to be sewn. |
| Critical | Sheave maintenance | Need to replace 2 main halyard sheaves, 2 turning block sheaves, and have fractional sheave box serviced. Also need clevis pin for forestay. (Lost it!) |
| Critical | Install halyards and wind indicator in mast | Waiting for sheave repair and wind indicator calibration |
| Critical | Replace topping lift shackle | COMPLETED! |
| Critical | Step mast, rig boat | Waiting for launch |
| High | Clean mast track, spray in lubricant | Waiting until it's closer to mast stepping time |
| High | Have main measured by loft for new battens | Main is at loft |
| High | Investigate why main halyard rope clutch closes itself | Looks like worn top handle, need to get new part |
| High | Re-rig outhaul | |
| Medium | Clean all winches | |
| Medium | Check Cunningham blocks for potential damage, replace if necessary. If replacing, consider leading line aft. | |
| Medium | Measure #1 genoa | |
| Medium | Measure anchor rode, mark length, clean anchor and anchor locker | |
|
|
||
| Critical | Clean battery terminals and install batteries onboard | |
| High | Loose battery cable terminal | Re-crimped. Good enough. |
| High | Mount Sailcomp display on bulkhead | COMPLETED! |
| High | Buy NiCd batteries for handheld VHF | COMPLETED! |
| High | Re-wire power to main panel to reduce voltage drop | |
| High | Solder lugs on wind indicator, calibrate | Being done by Jon |
| High | Replace coax for VHF antenna | |
| High | Service solar vent fan in head | Inspected, not sure if user-serviceable |
| Medium | Install new stereo | Removed old stereo housing, Jon offered to make new housing. Should also run new power and antenna wire; it looks BAD. |
| Medium | Move SailComp control panel to free up more room in compartment | Display moved, need to drill large hole for compass connection |
| Medium | Fix fluorescent light in head | |
| Medium | Re-install battery tiedowns | COMPLETED! |
| Low | Obtain extra light fixtures and bulbs, fix stbd v-berth light | Have obtained one fixture and bulb |
| Low | Re-wire entire boat | |
|
|
||
| High | Varnish cabin table | COMPLETED! |
| High | Clean, sand and varnish cabin sole and steps | COMPLETED! |
| High | Re-attach one (of two) missing handholds in companionway | COMPLETED! |
| Medium | Clean, sand and varnish grab rails on cabin trunk | |
| Medium | Make new hatch boards | Teak acquired, need lexan |
| Low | Strip hideous cetol off toe rails, varnish | |
| Low | Fix forward cabin door latch | Knob arrived, need to install |
| Low | Fix door latch to bow compartment | COMPLETED! |
|
|
||
| Medium | Clean freshwater tank | |
| Medium | Replace freshwater hoses | |
| Medium | Replace sink faucet in head | |
| Medium | Rebuild head pump | |
| Medium | Re-route waste hose, if possible, so V berth storage bin fits better, and remove unnecessary (and smelly!) spare waste hose. Consider removing Y-valve. | |
| Low | Replace manual bilge pump hose | |
|
|
||
| Critical | Replace oars for dinghy | COMPLETED! |
| High | Buy replacement pin for tiller extension | COMPLETED! |
| High | Clean bilge | COMPLETED! |
| High | Clean bilge strainer | COMPLETED! |
| High | Clean interior cabin | Everything except ceiling COMPLETED! |
| High | Install cedar strips (i.e. the kind used in closets) to improve smell | |
| Medium | Sew sail cover | |
| Medium | Install toilet paper dispenser | |
| Medium | If possible, fix latch for small hatch in main cabin | |